Winvic Construction uses latest 3D BIM modelling for new Ocado warehouse project


 

Winvic Construction has been awarded a fit-out contract by repeat client Ocado to design and deliver works in an industrial warehouse that the company previously constructed at Panattoni Park Luton. The fit-out is being designed using Level 2 building information management (BIM), which uses 3D models to detail every characteristic of a building or engineering project. Winvic aims to transform the warehouse shell into an EPC-rated ‘A’ temperature-controlled Customer Fulfilment Centre (CFC). The speculatively built 345,000 sq ft facility, with […]